Long Beach Local News

Browse technical resources about fiber raceway systems, cable trays, structured cabling standards, data center containment, and patch panel best practices.

HOME / Long Beach Local News - MCF Cable Routing & Structured Cabling

Related Topics:

Long Beach Local News
  • How long does a fiber optic ceramic ferrule last

    How long does a fiber optic ceramic ferrule last

    Zirconia ceramic ferrules are the top pick because they last long and do not change with heat in fiber optic networks. It also fights against chemicals. This helps your fiber connections stay strong in hard places. A ferrule's job is to hold the fiber core in perfect concentric alignment while maintaining extremely tight tolerances according to IEC 61755, IEC 61300. Many factors can affect the reliability and performance of a fiber connection.


  • Switches for different local area networks

    Switches for different local area networks

    These are the most popular switches in the market. They come with a fixed number of Ethernet ports (such as 8 Gigabit Ports, 16 ports, 24 ports, 48 ports etc). Fixed switches can be managed or unmana.


  • Relay protection remote backup and local backup

    Relay protection remote backup and local backup

    By having a backup system in place, problems caused by a protective relay or switching device failing to function are mitigated. Either the primary and secondary safeguards (known as remote backu.


  • What to do if the cold-joint panel is too long

    What to do if the cold-joint panel is too long

    This article provides a step-by-step guide for repairing a cold joint in concrete, including preparing the surface, cleaning the cold joint, applying a bonding agent, mixing and applying a concrete patch, and smoothing and finishing the surface. Saw-cutting and concrete re-pour to increase integration between fresh and set batches. The use of mechanical connectors, such as dowel bars, to. Learn how to prep and bond a next-day concrete pour to repair a cold joint. You'll gain actionable, plain-language steps and tips you can apply on real job sites. This discontinuity prevents the two pours from chemically integrating into a single monolithic unit, creating a weak plane within the. Cold joints are more common in older homes, large foundations, and pours done during temperature extremes. Either condition can cause timing problems during the pour.

    [PDF Version]
  • How long should the wiring for the distribution box be

    How long should the wiring for the distribution box be

    According to the National Electrical Code (NEC), the conductor must be long enough to extend outside the box's opening. The question is, how long should it be?It takes the incoming power and safely distributes it to different circuits throughout your building. Whether in a home or an industrial facility, this box keeps your electrical setup organized, functional, and efficient. ‌Wiring Direction‌: Wiring between the main circuit breaker and each branch circuit breaker in the box generally goes on the left, and the wiring out of the distribution box generally goes on the right. Single Phase Distribution Box generally consists of Double Pole MCBs, Single Pole MCBs, and RCCBs. Adjustments are made for the ground wire as you will see in the. The National Electrical Code (NEC) provides comprehensive safety standards for electrical installations, including requirements for electrical panels (main service panels and subpanels or breaker box). NEC Article 408 covers switchboards, switchgear, and Panelboards installation and applications.

    [PDF Version]

Structured Cabling & Cable Management Insights